What are the general operating requirements for gas singeing machine operators?

1. Before driving, check the craters, liquefied gas, pipelines and valves, brush bristle boxes and other parts, and make preparations for driving to prevent accidents caused by driving fuss.


2, should be called before driving. The first step is to start liquefied gas, the second step is ignition, and then open the air pump. Shut off the liquefaction valve and shut off the air pump when parking.


3, before driving or parking 20-30min, must agree with the LPG station before starting operation.


4, when the ignition with a long scroll, and avoid the liquefied gas valve, open a row of points and a row, in order ignition.


5. The equipment above the singeing machine main valve must not be touched.


6, liquefied gas valve to properly manage, singeing must be closed liquefied gas shunt and the total valve.


7, in the operation of the singeing machine in case of Fabric fire, should first turn off the liquefied gas, then shut the car, and then Bula out to cut off the fire.
For more details, please pay attention to China Grey Fabrics ()